Non-Insulated Structure for Menzies Distribution
Requirements
Menzies Distribution required a non-insulated structure at a site in Banbury. The structure was to be used as a wash bay for high vehicles to reverse into.
Solutions
The 5 metre x 12 metre temporary building was fitted with trapezoidal non-insulated steel sheet walling and non-insulated PVC roof covers.
A 5 metre leg was required to accommodate the height of the vehicles and we fitted a 4.8m wide x 4.4m height roller shutter door with manual operation.
For personnel access we fitted a single steel door with emergency push crash bar.
We fitted a distribution board for the washing equipment and external floodlights and dock lights.
Specification
- Clearspan Aluminium Frame Structure, 5m Wide x 12m Long Structure
with 5m Side Height - Chemical Anchors into Existing Concrete Base
- Steel Gutters & Downpipes to Side Elevations
- TRANSLUCENT Non-Insulated PVC Roof Covers – Silver
- Trapezoidal Non-Insulated Steel Sheet Walling – GreySingle Personnel Door c/w Emergency Push Crash Bar
- 4.8m W x 4.4m H Roller Shutter Door with Manual Operation
- Wind Speed 28m/s (When Fully Enclosed)
- Snow Load: 50kg/m2; EN13782 for temporary structures
Steel walled temporary warehouse
Steel wall and personnel access door
Steel wall with personnel door
Corner profile of temporary structure with lighting fitted
Electric circuit fitted within structure
Hight profile of interior of structure
Framework for temporary structure
Vehicle access roller shutter door
Tony
Andy